MEP Projects
TechnoPower capable of the applying engineering, design, consultancy, and
execution MEP projects includes, but not limited to, the following:
- Design, engineering, procurement, and execution of integrated electrical
installations for all establishments such as banks, residential, hospital and
commercial units, factories and all types of buildings. - Execution of integrated low-current systems, such as fire alarm systems, CCTV,
television, Sound system, telephones, security, and other systems. - Design, engineering and supervision of internal and external HVAC, Firefighting
and plumping works for all constructions and buildings projects (i.e., retails
projects, banks, residential and commercial units, factories and all types of buildings)
TechnoPower working with new model of PMO “ Project Management Office” to be main arm for main contractor’s companies to cover all electrical work includes design, Procurement, supervision and installation.
Our Latest Projects
BAYET EL KOMY Restaurant
Client : EL KOMY Group
- Area : 1800 sqm
- location: 5th statement
- Only 90 days to completed electrical and mechanical work from design,Shop drawing and execution.
EL KOMY Group HQ Office
Client : EL Komy Group
- Area : 2400 sqm,
- Location : 5th Statement
- Only 95 days to completed electrical and mechanical work from design, shop drawing and execution.
AL Arish Electrical Power station
Client: Hassan Allam ,
- Location : Al Arish
- Supply , install , testing and commissioning telephone paging and telephone system
New Giza University, Faculty of Engineering
Client : New Giza
- Location : New Giza city
- Main Contractor : EL Hazak Group
- We’re working as project management office “PMO model” with electrical main contractor ; we’re responsible of design , shop drawing, procurement cycle, invoices and supervision for all electrical work
GS 1 Egypt
Client : GS Egypt
- Area : 902 M2 , Location :Heliopolis
- Main Contractor : ZUIDAS
- Only 70 days to completed all electrical work from design, shop drawing and execution
Robusta Working Space
Client : Robusta
- Area : 400 M2
- Location : Nasr City
- Main Contractor : ZUIDAS
The project aim to create smart healthy decoration and utilizing small area Only 65 days to completed all electrical work from design, shop drawing and execution
El Araby
Client : Training Maintenance Center
- Area : 1200 Sqm,
- Location: El Bayoumi – Down Town Center
- Main contractor : ZUIDAS
the project aim to renovate one of the oldest branch of EL
Araby group with modern elevation to the entire center ;
responsible of all electrical work only from design, shop
drawing and execution
DEFACTO
Client : Defacto Maddi city center
- Area : 2100 sqm ,
- location Maddi city center
- main contractor : TRIPLE M
We’re working as project management office “PMO model “responsible of procurement, execution and supervision for all electrical work
Carrefour
- Client : Carrefour super market ,
- Area : 1600 sqm ,
- location: EL Sherouk City
- Main contractor : ZUIDAS
Only 60 days completed design, shop drawing and execution for all
electrical works.
ALLER AQA Quality , Control Laboratory
- Location: 6th October, Industrial Zone
- Applying design, shop drawing and execution for all electrical works
Colins
Client : Colins
- Areas aprox. 600-800 sqm ,
- main contractor : TripleM
- We’re working as project management office “PMO model “responsible of shop drawing, procurement, execution and supervision for all electrical work
Safety, Efficiency, Expertise: The Pillars of TechnoPower's Service.
Request a Free Quote: Tell us your needs, get a tailored solution.