MEP Projects

TechnoPower capable of the applying engineering, design, consultancy, and
execution MEP projects includes, but not limited to, the following:

  • Design, engineering, procurement, and execution of integrated electrical
    installations for all establishments such as banks, residential, hospital and
    commercial units, factories and all types of buildings.
  •  Execution of integrated low-current systems, such as fire alarm systems, CCTV,
    television, Sound system, telephones, security, and other systems.
  •  Design, engineering and supervision of internal and external HVAC, Firefighting
    and plumping works for all constructions and buildings projects (i.e., retails
    projects, banks, residential and commercial units, factories and all types of buildings)

TechnoPower working with new model of PMO “ Project Management Office” to be main arm for main contractor’s companies to cover all electrical work includes design, Procurement, supervision and installation.

Our Latest Projects

BAYET EL KOMY Restaurant

Client : EL KOMY Group

  • Area : 1800 sqm
  • location: 5th statement
  • Only 90 days to completed electrical and mechanical work from design,Shop drawing and execution.

EL KOMY Group HQ Office

Client : EL Komy Group 

  • Area : 2400 sqm,
  • Location : 5th Statement
  • Only 95 days to completed electrical and mechanical work from design, shop drawing and execution.

AL Arish Electrical Power station

Client: Hassan Allam ,

  • Location : Al Arish
  • Supply , install , testing and commissioning telephone paging and telephone system

New Giza University, Faculty of Engineering

Client : New Giza 

  • Location : New Giza city 
  • Main Contractor : EL Hazak Group
  • We’re working as project management office “PMO model” with electrical main contractor ; we’re responsible of design , shop drawing, procurement cycle, invoices and supervision for all electrical work

GS 1 Egypt

Client : GS Egypt 

  • Area : 902 M2 , Location :Heliopolis
  • Main Contractor : ZUIDAS
  • Only 70 days to completed all electrical work from design, shop drawing and execution

Robusta Working Space

Client : Robusta 

  • Area : 400 M2
  • Location : Nasr City
  • Main Contractor : ZUIDAS

The project aim to create smart healthy decoration and utilizing small area Only 65 days to completed all electrical work from design, shop drawing and execution

El Araby

Client : Training Maintenance Center

  • Area : 1200 Sqm,
  • Location: El Bayoumi – Down Town Center 
  • Main contractor : ZUIDAS
    the project aim to renovate one of the oldest branch of EL
    Araby group with modern elevation to the entire center ;
    responsible of all electrical work only from design, shop
    drawing and execution

DEFACTO

Client : Defacto Maddi city center 

  • Area : 2100 sqm ,
  • location Maddi city center 
  • main contractor : TRIPLE M
    We’re working as project management office “PMO model “responsible of procurement, execution and supervision for all electrical work

Carrefour

  • Client : Carrefour super market ,
  • Area : 1600 sqm ,
  • location: EL Sherouk City
  • Main contractor : ZUIDAS
    Only 60 days completed design, shop drawing and execution for all
    electrical works.

ALLER AQA Quality , Control Laboratory

  • Location: 6th October, Industrial Zone
  • Applying design, shop drawing and execution for all electrical works

Colins

Client : Colins

  • Areas aprox. 600-800 sqm ,
  • main contractor : TripleM
  • We’re working as project management office “PMO model “responsible of shop drawing, procurement, execution and supervision for all electrical work

Safety, Efficiency, Expertise: The Pillars of TechnoPower's Service.

Request a Free Quote: Tell us your needs, get a tailored solution.

Request a Quote

Ready to Work Together? Build a project with us!
Scroll to Top